Thursday, May 24, 2012

Upcoming work

The next step will be to get the front suspension set up and tracking straight.  I need to make longer mounting tabs for the upper A-arms.  After that I intend to cut and bend the side rails and install the seat mount rails.
I need to think on the steering wheel mounts, shifter, start, and electrical controls.  The rear swing arm mounts will be  a couple box tubes with angle flanges to catch the swing arm pivot.  The swing arm/ engine mount needs to be made and that brings us to the differential and drive train.  Rear wheel hubs, brakes,  electrical wiring etc.  Keep watching.

No comments:

Post a Comment